Central Railway.
Construction of ROB in lieu of existing level x-ing no 28/C at km 36-37 Kharigaon in between Thane - Kalyan Station.
The work consist of drilling of piles by rotary drilling machine only. Casting of piles, pile cap and piers with RCC inside the running track as well as outside the track.Submission of launching scheme. The main girders of ROB have to be fabricated with using submerged arc welding as per IRS codal provisions (Welding Bridge Code) and IS Code 4353. Fabrication and launching of steel girders by contractor's road cranes during traffic block. Casting of deck slab etc.
Mumbai Railway Vikas Corporation Ltd
Construction of FOB's, Skywalk, Platform with shelter and other works in connection with trespass control at Kanjurmarg & Thane Stations in Mumbai.
Mumbai Railway Vikas Corporation Ltd.
Construction of elevated booking office, North & South FOB's Platforms with platforms covers and service buildings like RRI and related structures at Oshiwara and extension of Harbour lines between ADH-GMN stations of Western Railway under MUTP-(LOT-I)
The work consist of construction of steel frame consisting of steel columns and beams, casting of slab and construction of the booking office on the deck, construction of south foot-over bridges, construction of platform on slow corridor, construction of platform shelter of the same. The scope also includes general electrification work of above building.
Mumbai Railway Vikas Corporation Ltd.
Construction of PEB platform shelter, platforms, subway and booking office building at Jogeshwari(NW) in connection with extension of Harbour lines between ADH-GMN (MUTP-II)
The work consist of construction of pre engineered building platform shelter as per bid drawing, construction of the subway , platforms and the booking office. The scope also includes electrification work of building.
Mumbai Railway Vikas Corporation Ltd.
Construction of new stabling lines including earthwork, bridge construction and linking of track etc at Vasai (South), Borivali (North), Goregaon (North) station on Western Railway (MUTP-II)
The work consist of earthwork excavation about 2150cum at Vasai (North), in all pathway and linking of tracks etc, at Borivali (North) earthwork in excavation about 3635 cum, and linking of track etc, at Borivali (South) bridge construction, linking of track, at Goregaon (North) linking of track.
Western Railway
Construction of Station building, booking office, PRS, Quarters and dismantling goods shed including track work with other misc works at Vapi & Navsari stations in connection with Western Dedicated Freight Corridor on VR-ST section of Mumbai Division of Western Railway.
The work consist of construction of staff quarters, PRS & booking office, duty bunk, goods shed with office, toilet block, dismantling of goods shed & track, laying and linking of Railway track, points and crossing and related works at Navsari & Vapi Stations of Mumbai Division with other miscellaneous works between Gholvad and Bhestan stations on Virar –Surat Section.
Mumbai Railway Vikas Corporation Ltd.
Track works in connection with extension of harbour line from ADH-GMN including supply of track fittings and ballast under MUTP-II.
The work consist of linking of railway tracks for about 12.5 km length (Km 21/5 to Km 27/10) and 15 turnouts on PSC Sleepers including supply of track fittings.
Western Railway
Rebuilding of North abutment of bridge no. 92 on Vaitarna South Creek between Vaitarna-Saphale station of Mumbai Division of Western Railway on Virar-Surat Station.
The work consist of complete rebuilding of north abutment on pile foundation of bridge including wing and return walls. Restoring protection work around the new abutment and wing wall. Providing assistance in placement and removal of the relieving girders and main girders. Breaking of the stone masonry of the existing abutment and wing wall to the extant it is required as per the drawing to complete the work. Construction of of micro-piles for protection of the existing bank during the execution. Providing coffer dams besides the existing railway track for making the working space for fabrication, casting of pre-cast beams, storage of material required for execution. Construction of Jetty’s. Launching of precast beams. Dismantling of existing track and laying and linking of new track on channel sleepers.
Mumbai Railway Vikas Corporation Ltd.
Extension / modification of bridges no. 41,43,46,47 & 48 in connection with extension of Harbour lines between Andheri to Goregaon station of Western Railway (MUTP-II)
The work consist of modification / extension to the bridges. This may involve working under power & traffic blocks. All bridges are to be constructed close to running railway tracks.
Western Railway.
Construction of road over bridge i.e. Jogeshwari (North) between km. 25/8-9 on pile foundation consist of RCC substructure / super structure with steel composite girder, RCC deck slab, POT PTFE bearing and carrying out work as per Railways approved drawing with Geotechnical investigation in lieu of level crossing no 26 & 27 between Jogeshwari & Goregaon Stations of Western Railway.
The work consist of construction of Road Over Bridge i.e. Jogeshwari (North) between Km 25/8-9 on pile foundation consist of RCC substructure / superstructure with steel composite girder, RCC deck slab, POT PTFE bearing including design of complete structure as per Railway’s approved drawings and carrying out Geotechnical Investigation in lieu of level crossing no. 26 & 27 between Jpgeshwari & Goregaon stations. The overall length of bridge is approx. 100m and width will be 20.70m. Construction of boundary wall at the proposed site of work on both sides. Providing protective screen of OHE on ROB.
Western Railway.
Construction of road over bridge i.e. Jogeshwari (South) between km. 23/14-24/1 on pile foundation consist of RCC substructure / super structure with steel composite girder, RCC deck slab, POT PTFE bearing and carrying out work as per Railways approved drawing in lieu of level crossing no 24 & 25 between Jogeshwari & Goregaon Stations of Western Railway.
The work consist of construction of Road Over Bridge i.e. Jogeshwari (South) between Km 23/14 – 24/1 on pile foundation consist of RCC substructure / superstructure with steel composite girder, RCC deck slab, PTFE bearing as per Railway’s approved drawings in lieu of level crossing no. 24 & 25 between Jpgeshwari & Goregaon stations. The overall length of bridge is approx. 70m and width will be 35.50m. Construction of boundary wall at the proposed site of work on both sides. Providing protective screen of OHE on ROB.
Mumbai Railway Vikas Corporation Ltd.
Construction of elevated booking offices at Jogeshwari (North) and (South), extension / modification of the existing foot-over bridges at Jogeshwari station of Churchgate – Virar Suburban section of Mumbai under MUTP-II.
The work consist of construction of steel frames consisting of steel columns and beams, casting of slab and construction of the booking office on the deck, connecting the deck to the existing foot-over bridges, extension / modification of the foot-over bridges including general electrification work of building.
Western Railway.
: Construction of staircase and cast in situ box of 10m wide subway across up and down through track and platform No. 4 at Naigaon station as per new scheme between Borivali-Virar section of Mumbai Central Division in connection with quadrupling of tracks between Borivali-Virar section of Western Railway.
The work consist of construction of track supporting structure by driving piles as per approved drawing and scheme. Excavation of balance subway and construction of cast in situ RCC Box under two tracks and Platform No. 4. Providing opening for staircase in existing pushed RCC Box under platform 1, 2& 3. Providing RCC staircase connecting all platforms and circulating area with subway. Finishing work of subway & staircase as per instruction of Engineer in charge. Extension of existing island platform no. 2,3 & platform no. 4 by approximately 30 mtrs towards North side.
Western Railway.
Construction of home platform along with washing apron two nos. washing cum inspection pit lines at Bandra Terminus in BCT Division of Western Railway.
The work consist of construction of high level home platform alongwith washing apron. Construction of two numbers washing cum inspection pit lines. Dismantling of existing tracks and linking on newly constructed pits.
Western Railway.
Jogeshwari (AT) repairs to road for good facilities at north side.
The work consist of repairs to road for good facilities at north side of Jogeshwari (AT).
Western Railway.
The work consist of creation of additional openings by
Western Railway.
Construction of new shed at north end on line no. 8 & 9, balance work of existing shed and strengthening of existing shed at Kandivali car shed.
The work consist of construction of columns, beams, flooring, etc. at north end of Kandivali carshed across line no. 8 & 9 for new shed. Fabrication & erection in position main truss, north light truss, purlins, MS gutters, bracings, etc for the new shed. AC sheeting, downtake pipes, AC Ridge, NLG, to complete the shed in the new shed. Balance work of AC sheeting, downtake pipes, bracings, MS gutter, NLG , drain, etc in the existing whed at North end. Strengthening work of the existing concrete shed member as per Railways approved drawings.
Western Railway.
Construction of new station building at Borivali including development of circulating area in Mumbai Division of Western Railway.
The work consist of construction of new station building at Borivali including development of circulating area in Mumbai Division of Western Railway.
Western Railway.
Dismantling and rebuilding of FOB’s at Mahalaxmi and Lower Parel railway stations in connection with DC-AC work on CCG – VR Section of Mumbai Division.
The work consist of construction as per Railways design of foundation, columns, deck and landing of Foot Over Bridge with all material to be arranged by the contractor.
Western Railway.
Dismantling and rebuilding of FOB’s at Dadar and Matunga Road Railway Stations in connection with DC-AC work on CCG-VR section of Mumbai Division.
The work consist of construction as per Railways design of foundation, columns, deck and landing of Foot Over Bridge with all material to be arranged by the contractor.
Mumbai Railway Vikas Corporation Ltd.
The work consist of creation of additional openings by
Mumbai Railway Vikas Corporation Ltd.
Supply of machine crushed stone ballast (65mm) along the cess and formation in connection with provision of EMU stabling sidings at Bhayander on Western Railway (MUTP-II).
The work under consideration is for supply of machine crushed stone ballast along the cess at Bhayander Station North –West side and in between Mira Road Bhayander at nominated location between Km. 40/03 – 40/15.
Western Railway.
Balance work of Augmentation maintenance facilities for EMU’s at EMU work shop Mahalaxmi and carshed at Mumbai Central and Kandivali.
Western Railway.
Construction of major bridges and road under bridges between Borivali – Bandra Terminus section in connection with construction of 6th line between Borivali – Mumbai Central.
The work consist of construction and extension to existing major bridges and sub way between Vile Parle to Borivali section for bridge nos 46, 56, 61 & bridge 62.